Welcome to Sivell Engineering Limited
Experienced in Demolition, Dismantling, Asbestos Removal, Excavation

 

As a Company, we take pride in our responsibility towards health and safety, and towards the welfare of our customers, employees and the general public at all times.  All demolition works are carried out in acordance with BS6187:2000 code of practice.

 

 
Working to the safest, most effective and most efficient programme is key to our business. With our in-house team of specialists we will refine our sequence of works to suit the remediation strategy.
Factors contributing to the demolition strategy are:-
-   Asbestos Removal

-   Demolition sequence to reduce safety issues

-   Reduction of noise, dust & nuisance

-   Service disconnections

-   CDM regulations

 
As part of the demolition process the sequence will be as follows:-
-   All personnel/visitors will undergo a site induction.
-   Correct PPE will be required before entering site.
-   All operatives will have tool box talks each morning to confirm
    work areas and scope of work. Including reading method statements.
-   Structural Investigations of existing structures will be undertaken
     prior to method statement production.
-   Installation of fencing/exclusion zones with warning signage to
    demolition areas.
-   All Asbestos Removal will be carried out by competent personnel.
    Certificates of reoccupation and transfer notes will be available onsite
    and enclosed in the H&S file.
-   Use of our latest equipment and methods to reduce noise & dust.
Home